CANADA Ontario NextStar Energy
battery joint factory

The joint project between LG Energy Solution and Stellantis carried out the construction of factory mechanical equipment
piping to produce lithium-ion battery cells in electric vehicle (EV) batteries.ey Project
- Plumbing system design and installation:
- The plumbing system is critical because it can handle chemicals, electrical systems, and high-temperature and high-pressure fluids within the battery production plant.
Plumbing supplies cooling water, steam, air, electrolytes, etc., which are essentialfor various facilities, and the precise design is carried out after work.
- Installation of mechanical piping:
- When the various mechanical facilities required for the battery production process are installed, pipes for physical connection between them are essential. They include compressed air systems, coolant circulation systems, chemical transport pipes, and so on. The material of the piping should be stainless steel or fire resistant, depending on the type of fluid used. It should be designed to operate reliably and safely in high-temperature and high-pressure environments.
- Safety and quality control of pipes:
- Since piping is directly related to the safety of the factory, pressure tests and fluid flow rate tests are required. In addition, flexibility and durability of piping should be ensured by considering deformation due to vibration, temperature change, and thermal expansion. In particular, EV battery production plants require a high degree of accuracy and stability, so detailed review and construction are required.
SHE&S.CO.,LTD has done all certificate acquisition construction for Canadian piping installation and quality.

CANADA Ontario NextStar Energy
battery joint factory
LG Energy Solutions and Stellantis Co-Project
Certification Status of Canadian Pipe Manufacturing Installation, SHE&S.CO., LTD
- TSSA (Technical Standards and Safety Authority) Certification
-
- COA (Certificate of Authorization)
- CRN (Certificate of Registration Number)
- Certificate of Conformity
-
- Model: CEG-SH-1
- Model: CEG-SH-2
- Model: CEG-SH-3
- Model: CEG-SH-4
- CWB (Canadian Welding Bureau) Certificate
-
- CSA W47.1: Certification for welding companies involved in the fabrication of steel structures.
- CWB Welder Certification, CWB Company Certification
LG Energy Solution Hyundai Motor
Savannah Battery Joint Plant in the United States
The joint project between LG Energy Solution and Hyundai Motor Co. carried out plumbing work on plant machinery and
equipment to produce lithium-ion battery cells for electric vehicle (EV) batteries in Savannah, Georgia
- Plumbing system design and installation:
- The plumbing system is critical because it can handle chemicals, electrical systems, and high-temperature and high-pressure fluids within the battery production plant. Plumbing supplies cooling water, steam, air, electrolytes, etc., which are essential for various facilities, and the precise design is carried out after work.
- Installation of mechanical piping:
- When the various mechanical facilities required for the battery production process are installed, pipes for physical connection between them are essential. They include compressed air systems, coolant circulation systems, chemical transport pipes, and so on. The material of the piping should be stainless steel or fire resistant, epending on the type of fluid used. It should be designed to operate reliably and safely in high-temperature and high-pressure environments.
- Safety and quality control of pipes:
- Since piping is directly related to the safety of the factory, pressure tests and fluid flow rate tests are required. In addition, flexibility and durability of piping should be ensured by considering deformation due to vibration, temperature change, and thermal expansion. In particular, EV battery production plants require a high degree of accuracy and stability, so detailed review and construction are required.
Hungary Battery Factory Project
SK on Hungary ivancsa project
Samsung SDI Hungary Goed project
Plant Machinery and Equipment Piping Work to Produce Lithium-Ion Batteries
- Plumbing system design and installation:
- The plumbing system is critical because it can handle chemicals, electrical systems, and high-temperature and high-pressure fluids within the battery production plant. Plumbing supplies cooling water, steam, air, electrolytes, etc., which are essential for various facilities, and the precise design is carried out after work.
- Installation of mechanical piping:
- When the various mechanical facilities required for the battery production process are installed, pipes for physical connection between them are essential. They include compressed air systems, coolant circulation systems, chemical transport pipes, and so on. The material of the piping should be stainless steel or fire resistant, epending on the type of fluid used. It should be designed to operate reliably and safely in high-temperature and high-pressure environments.
- Safety and quality control of pipes:
- Since piping is directly related to the safety of the factory, pressure tests and fluid flow rate tests are required. In addition, flexibility and durability of piping should be ensured by considering deformation due to vibration, temperature change, and thermal expansion. In particular, EV battery production plants require a high degree of accuracy and stability, so detailed review and construction are required.